Analysis · EV Infrastructure Profiles

EV infrastructure profiles: who runs U.S. charging

Economic profiles of the companies that build, own and run public EV charging: business models, network size, pricing, revenue and margins, and the shift to NACS.

Drive Economics has no affiliation with, sponsorship from, or endorsement by any charging network, automaker, charger maker, utility or program named here.

79,222public DC fast ports
51%held by Tesla
182,703public Level 2 ports
4profiles, more planned

The short answer

  • Three business models run U.S. public charging. Owner-operators such as EVgo and Electrify America own chargers and sell charging. Asset-light companies such as ChargePoint sell chargers and software to site hosts, who own them and set prices. Tesla builds the cars, the chargers and the network.
  • Fast charging is concentrated; Level 2 is not. The four networks profiled here hold 71% of the 79,222 public DC fast ports in AFDC, and Tesla alone holds 51% (AFDC). ChargePoint holds 44% of 182,703 public Level 2 ports.
  • Utilization decides returns. Fast ports were in use 15.9% of the time nationally in Q3 2026, 21.1% across the 30 largest metros, and the average price was $0.540 per kWh (Paren).
  • These are economic profiles, not endorsements. Each one shows where the company sits in the value chain, how drivers pay, how the company earns money and what it means for drivers, site hosts and utilities.
83,578public charging sites in AFDC
79,222public DC fast ports
182,703public Level 2 ports
15.9%fast-port utilization, Q3 2026

Company profiles

Market share by network

Public DC fast-charging ports by network

Open public ports in the United States. Profiled networks highlighted.

Swipe to see the full chart →

010k20k30k40kTesla Supercharger3,294 sites40,331Electrify America1,222 sites6,041EVgo1,185 sites5,272ChargePoint48,877 sites4,795Red E1,081 sites2,218Blink5,844 sites1,968Ionna205 sites1,688EV Connect1,345 sites1,577Ford Charge351 sites1,270Rivian Adventure Network164 sites1,172Non-networked4,783 sites1,030Walmart110 sites916
Source: AFDC station data, October 25, 2026. Tesla Supercharger excludes Tesla Destination (Level 2) chargers.

Public Level 2 ports by network

Level 2 is spread across many host-owned networks.

Swipe to see the full chart →

020k40k60k80kChargePoint48,877 sites81,112Blink5,844 sites20,356Tesla Destination3,919 sites14,573Non-networked4,783 sites12,955LOOP1,232 sites9,857Vialynk901 sites4,420AmpUp832 sites3,490EV Connect1,345 sites2,978FLO1,223 sites2,895Powerflex177 sites2,872
Source: AFDC station data, October 25, 2026.

Average DC fast ports per site

Site size affects waiting time and redundancy.

Swipe to see the full chart →

02468101214Tesla Supercharger3,294 DC fast sites12.2Electrify America1,192 DC fast sites5.1EVgo1,182 DC fast sites4.5ChargePoint4,421 DC fast sites1.1
Source: AFDC station data, October 25, 2026. ChargePoint figures reflect AFDC listing each charger location separately.

Three business models

Asset-light

Sell equipment and software

Revenue comes from hardware and subscriptions. The site host owns the charger, pays for electricity and keeps the charging revenue. Example: ChargePoint.

Owner-operator

Own chargers, sell charging

Revenue comes from each kWh or minute sold. The operator carries the capital cost and utilization risk. Examples: EVgo, Electrify America, Ionna.

Vertically integrated

Cars, chargers and network

The network supports vehicle sales and earns charging revenue from all brands. Example: Tesla.

Other networks in the market

Networks with at least about 100 public listings or 300 fast ports in AFDC, with port counts. Profiles of more networks are planned.

Hardware, software and owner-operator

Blink

Mostly Level 2; sells equipment and also owns some stations.

5,844 sites · 1,968 DC fast · 20,356 Level 2

Automaker joint venture

Ionna

Fast-charging network formed by automakers; converted former Circle K sites in 2026 and added the second-most fast ports in Q3 2026.

205 sites · 1,688 DC fast · 0 Level 2

Fast-charging network

Red E

Among the five networks adding the most fast ports in Q3 2026.

1,081 sites · 2,218 DC fast · 2,597 Level 2

Retailer-owned

Walmart

Fast charging at its own stores; added the third-most fast ports in Q3 2026.

110 sites · 916 DC fast · 0 Level 2

Automaker network

Rivian Adventure Network

Rivian’s fast-charging network; some new sites are NACS-only.

164 sites · 1,172 DC fast · 0 Level 2

Automaker network

Mercedes-Benz HPC

Mercedes-Benz High-Power Charging sites.

80 sites · 748 DC fast · 0 Level 2

Energy company

bp pulse

Oil-and-gas company network with some of the largest new non-Tesla sites.

91 sites · 854 DC fast · 0 Level 2

Energy company

Shell Recharge

Shell’s charging network.

76 sites · 496 DC fast · 1 Level 2

Automaker-branded network

Ford Charge

Listed in AFDC as Ford Charge.

351 sites · 1,270 DC fast · 0 Level 2

Software platform

EV Connect

Network software for hosts and fleets; Level 2 and fast charging.

1,345 sites · 1,577 DC fast · 2,978 Level 2

Hardware and software

LOOP

Mostly Level 2.

1,232 sites · 162 DC fast · 9,857 Level 2

Hardware and software

FLO

Mostly Level 2; one NACS-only fast site opened in Q3 2026.

1,223 sites · 178 DC fast · 2,895 Level 2

Fast-charging network

Vialynk

Opened some of the largest non-Tesla sites in Q3 2026.

901 sites · 518 DC fast · 4,420 Level 2

Software platform

AmpUp

Level 2 network software.

832 sites · 17 DC fast · 3,490 Level 2

Software platform

SWTCH

Level 2 network software.

569 sites · 278 DC fast · 2,095 Level 2

Hardware and software

OpConnect

Mostly Level 2.

489 sites · 141 DC fast · 1,693 Level 2

Utility-owned

FPL EVolution

Florida Power & Light’s FPL EVolution fast-charging network.

109 sites · 394 DC fast · 0 Level 2

Not on a network

Non-networked

Stand-alone chargers without network software.

4,783 sites · 1,030 DC fast · 12,955 Level 2

Q3 2026 notes are from Paren. Counts are AFDC public stations as of October 25, 2026.

About these profiles

Network counts are open public stations in AFDC station data, downloaded October 25, 2026 (AFDC station API). Company-reported totals include private and partner ports and can be higher.

This series follows the company-profile format used on VPP Economics: role in the value chain, business model, economics and implications.

Drive Economics has no affiliation with, sponsorship from, or endorsement by any charging network, automaker, charger maker, utility or program named here.